Latest Search
Quote
| Back Zoom + Zoom - | |
|
CHINA POWER (02380.HK) Xinjiang Mulei 800MW Wind Power Project Commences Operation
Recommend 8 Positive 14 Negative 5 |
|
|
|
|
CHINA POWER (02380.HK) announced that the 800MW self-use green power substitution project of Mulei under its subsidiary Yaomeng Energy and CPI Shenhuo has been fully commissioned. The project is expected to supply approximately 2.3 billion kilowatt-hours of green electricity annually to high energy-consuming enterprises. It has successfully explored a new model featuring "direct green power supply, industrial synergy and multi-party win-win", providing replicable practical experience for the low-carbon transformation of the industry. The Mulei project is located on a ridge at an altitude of 2,350 meters in Xinjiang and is equipped with 87 large wind turbines. (su/a) Auto-translated by AI This article was automatically translated by AI, the original language version should be considered the authoritative version. AASTOCKS.com Limited does not guarantee its accuracy or completeness and accepts no liability for any damages or losses arising from the use of this translation. More Details
AASTOCKS Financial News |
|
