News Sharing
For sharing news, please enter the email address of you and the receiver, then press SEND button.*Mandatory Fields
Receiver*
Enter email addresses, separated by semicolon (;). E.g. a@a.com;b@b.com
Your email address*
Content Sharing
CGN POWER (01816.HK) Huizhou Unit 4 Commences Full Construction
CGN POWER (01816.HK) announced that Huizhou Unit 4 of its subsidiary CGN Huizhou Second Nuclear Power carried out the first concrete pouring (FCD) for the reactor main building on ...
Reset
Send
The window will close in 5 seconds
CGN POWER (01816.HK) Huizhou Unit 4 Commences Full Construction
Close
Recommend
7
Positive
4
Negative
1
 
 

CGN POWER (01816.HK)  -0.010 (-0.322%)    Short selling $39.51M; Ratio 13.346%   announced that Huizhou Unit 4 of its subsidiary CGN Huizhou Second Nuclear Power carried out the first concrete pouring (FCD) for the reactor main building on May 10 (yesterday). This marks the official commencement of full-scale construction of Huizhou Unit 4 and its entry into the civil construction phase. Huizhou Unit 4 has an installed capacity of 1,209MW. (ha/da)(HK stocks quote is delayed for at least 15 mins.Short Selling Data as at 2026-05-22 16:25.)

Auto-translated by AI
This article was automatically translated by AI, the original language version should be considered the authoritative version. AASTOCKS.com Limited does not guarantee its accuracy or completeness and accepts no liability for any damages or losses arising from the use of this translation.

AASTOCKS Financial News

Copyright(C) AASTOCKS.com Limited 2000. All rights reserved.
Disclaimer: AASTOCKS.com Ltd, HKEx Information Services Limited, its holding companies and/or any subsidiaries of such holding companies endeavour to ensure the accuracy and reliability of the Information provided but do not guarantee its accuracy or reliability and accept no liability (whether in tort or contract or otherwise) for any loss or damage arising from any inaccuracies or omissions.